Clapham One
U+I Group transform areas of towns and cities into thriving communities and neighbourhoods, with a portfolio of mixed- use regeneration projects within London, the south-east, Manchester and Dublin.
In 2012, together with joint venture partners United House, U+I Group delivered a landmark £80m mixed-use regeneration scheme which has transformed leisure services across two sites in Clapham town centre, south west London.
The Public Private Partnership (PPP) scheme provided Clapham with a new highly-sustainable leisure centre, a state-of-the-art library, a family health centre and high-quality residential accommodation, including affordable housing in partnership with Notting Hill Housing Group.
The PPP deal meant that in the depths of the recession, U+I were able to secure £35 million funding for this important project, including loan funding from the Homes and Communities Agency's Kickstart programme, pre-sell £46 million of the development, and guarantee the London Borough of Lambeth a brand new library and leisure centre funded entirely from the sale of the private sector element of the development.
Mary Seacole House on Clapham High Street was replaced by The Library Building, designed by Studio Egret West. The ground floor and basement is based around an audacious spiral design, connecting to the new health centre, a café, performance space and community rooms, reinforcing the community spirit of the development.
The old Clapham Swimming Pool on Clapham Manor Street was replaced with a brand new sustainable leisure centre designed by LA Architects. Facilities include a 6-lane, 25m swimming pool, a much larger fitness suite, a 4-court sports hall, climbing wall and community rooms. The leisure centre opened to the public in December 2011.
Also located on this site is The Manor Building (19 private homes) and 4 Bicycle Mews (44 affordable homes in partnership with Notting Hill Housing Group) both completed in July/August 2011.
Clapham One was awarded Best Mixed-use Development at the International Property Awards 2011 as well as 11 other awards for its architecture, housing design and the quality of its facilities.
Project data:
- Date acquired: 2007
- Date completed: 2012
- Development value: £80 million
- Architect: Studio Egret West, DLA Architecture, LA Architects, ABIR
- Development partners: London Borough of Lambeth
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Algarve House, Southwark.
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Cockpit Yard.
- Development Securities.
- Mixed-use development.
- Placemaking.
- Preston Barracks, Brighton.
- Public private partnership.
- Regeneration.
- Skipton House project.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|The New]] [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Clapham]]
- U and I Plc - Clapham One
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.